POWER INTERRUTION



N O T I C E
To: OUR VALUED MEMBER-CONSUMERS-OWNERS:
Please be informed that on March 17, 2024, due to the planned interruption of NGCP, the affected power customers of Sultan Kudarat Substation will be shifted or transferred to Tacurong Substation via the interconnection of Tacurong.
Sultan Kudarat 69KV Line.
​
Because of this scheme, NGCP is requiring affected customers to implement load curtailment or reduction for a certain period of time to avoid overloading the interconnected transmission lines. The table below shows your load curtailment to apply.
​
During the shifting process, COTELCO-PPALMA’s Gumaga S/S, Villarica S/S, and Dualing S/S will be affected and will schedule a rotational brownout in all areas. The rotational brownout may vary depending on the load in every area, as we follow the given load curtailment by NGCP. The schedule will be posted before the said interruption.
​
Thank you.